Inspection and Maintenance — GEK 107048
Hot Gas Path Inspection — Disassembly Procedures
HGP-D-22
Operation 15 — How to Remove Lower Half First Stage Nozzle (With Tangential Support Pin)
1. Remove the tangential support bolts and retainer plates. Discard bolts and retainer plates.
2. Remove the support pins by breaking the contact between the pin and bushing with a wrench and
withdrawing the pins by means of the threaded extraction hole in the center of the support pin.
3. Remove the horizontal support blocks from the left and right side. Identify the support blocks for
left and right side location
4. Roll out the lower half nozzle by attaching one end to a hook with a straight cable and attaching
the other end to a one ton comealong or chainfall. By alternately raising on the cable and lowering
on the chainfall, the retaining ring and nozzle can be rotated 90
°
.
5. Reattach the chainfall to pickup the nozzle at its vertical centerline. Continue the roll out process
until the nozzle can be lifted clear of the unit.
6. Set the nozzle flat on a piece of plywood or equivalent to protect it from damage.
Operation 16 — How to Remove Lower Half Second and Third Stage Nozzle Radial Retaining
Pins
Note:
The second stage nozzle radial retaining pins are secured to the turbine
casing by threaded plugs which are screwed into the casing, each plug
is staked in two places.
The third stage nozzle radial retaining pins are held in position by
plates secured to the turbine casing by hex bolts with lockplates.
1. Remove all the second stage nozzle radial retaining pins, if pins are not stamped as to location,
stamp the location upon removal.
2. Remove the holding plates which position the radial third stage nozzle retaining pins. Remove
the retaining pins, if pins are not stamped as to location, stamp them upon removal.
Operation 17 — How to Remove Lower Half Second and Third Stage Nozzle Segments
(See Figure HGP-D.13)
1. Each nozzle segment can be removed from the turbine casing by rolling it out individually on its
outer sidewall forward and aft hook fits. Each diaphragm segment is removed along with its adja-
cent nozzle segment as one piece. Mark each segment per Inspection Form PGS/GT-FF-6102 and
PGS/GT-FF-6099 numbering sequence.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...