Inspection and Maintenance
Introduction
I–3
It must be recognized that the foregoing estimated outage requirements can be used for estimating mainte-
nance cycles, however, these numbers will vary depending upon the many factors which establish the op-
erating conditions for a specific installation. The inspection cycles will vary depending upon fuel, duty
cycle and maintenance philosophy of the owner. The inspection manhours will vary depending upon pre-
planning, availability of parts, productivity, weather conditions, union regulations, supervision, etc.
Precise estimates of the outage duration resource requirements and costs associated with the inspection
of a specific installation may be obtained from your GE Company Apparatus and Engineering Services
Operation Representative.
Good maintenance planning for minimum down-time requires the availability of replacement parts, ei-
ther new or previously repaired, that can be exchanged with existing parts. The exchanged parts can then
be repaired without extending the down-time.
To ensure optimum performance of the gas turbine, the minimum stock of spare parts should be able to
support the service inspection. A predetermined central location can stock spare parts that are adequate
for hot gas path inspection. Many gas turbine plants stock capital spare parts on-site, recognizing that
this parts availability minimizes the turn-around time required for major overhauls.
The planned maintenance program anticipates the needs of the equipment and is tailored to meet the re-
quirements of the system for utilization, reliability, and cost.
Types Of Inspections
The types of inspections covered in this publication may be broadly classified in terms of unit “running”
and unit “shutdown” inspections. The running inspection is performed during start-up and while the unit
is operating. This inspection indicates the general condition of the gas turbine unit and its associated
equipment. The shutdown inspection is performed while the unit is at a standstill. The shutdown inspec-
tions include “Combustion,” “Hot Gas Path,” and “Major” inspections. These latter inspections require
disassembly of the turbine in varying degrees. See Figure 1-5.
Turbine starting reliability can be aided by conducting a “standby” inspection while the unit is shut
down. Routine servicing of the battery system, changing of filters, checking oil and water levels, clean-
ing relays, checking device settings and calibrations, lubrication and other general preventative mainte-
nance can be performed in off-peak hours without interrupting the availability of the turbine. Certain
designated accessories in need of repair or replacement may be returned to the factory on either a repair
and return basis or an exchange basis.
GE Company Field Service Representatives are available to provide technical direction or consultation
for repair and replacement.
Periodic test runs are also an essential part of a good maintenance program. It is highly recommended
that the unit be operated at load for at least 1 hour bi-monthly, and data recorded. It is recommended that
gas turbines on extended shutdown (three weeks or more) should be operated on turning gear or ratchet
for one hour each day to prevent the buildup of corrosive deposits in the turbine wheel dovetails or the
gas turbine should be operated at full speed, no load for one hour per week to dry the turbine out and
thereby prevent moisture condensation in the turbine dovetail crevices.
Special inspections such as borescope and eddy current probe, can be used to further plan periodic main-
tenance without interrupting availability. It is also recommended that visual inspections be performed
whenever there is personnel at the unit.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...