8. Tighten and torque all the horizontal joint bolting by starting at the mid point of the flange on both
sides. Then torque alternately forward and aft both sides.
9. Tighten and torque the vertical joint bolts starting at top centerline and alternately working to-
ward the horizontal joint.
10. Install the upper half bolts to the inner and outer diffuser upper half strut ends. Tighten and torque
the bolts.
Note:
Refer to the Frame Assembly Exhaust (ML0706) drawing in the Parts
Lists and Drawings Volume Service Manual and weld the bolts and
nuts as called for on the outer diffuser bolts and the outer horizontal
joint nuts.
11. Install the left and right side horizontal joint insulating packs. Bend up one corner of all lockplates
to lock the bolts.
12. Install the upper half outer insulating pack on the aft upper vertical flange of the exhaust frame.
Bend up one corner of all lockplates to lock the bolts.
13. Reconnect all pressure and temperature instrumentation to the exhaust frame and the inside of
the inner barrel tunnel.
14. Using chainfall or comealong, rig to the rail beam and trolley hoist inside the exhaust transition
duct. Remove the bolting from the rail beam and slide the rail and trolley out of the transition duct
and rig to an overhead crane. Remove rail and hoist clear of the unit. Install all removed hardware,
handtight, for safe keeping.
Operation 11 — How to Remove Mechanical Support Jacks from Underneath Unit Casings
CAUTION
Mechanical support jacks are not to be removed until all
upper half casing have been installed and bolted in place.
1. Remove the mechanical support jacks and dial indicators from underneath the unit casing flanges
and forward inlet bell mouth flange.
2. Remove any shim packs if used. Applicable to bases that have a transaxial “I” beam only.
3. Replace all base cutout floorplates and bolt in place.
4. Accumulate all jacks and dial indicators and return to storage.
Operation 12 — Take Final Rotor Positioning Checks
1. Refer to the Hot Gas Path Inspection section, disassembly operation 3 in this Service Manual,
for Rotor Positioning Checks procedures.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...