Inspection and Maintenance — GEK 107048
Combustion Inspection — Reassembly Procedures
CI-R-20
Note:
Use of grease or some other adhesive will help to retain the gasket in the
groove.
2. Carefully insert secondary nozzle through the center hole of the primary fuel nozzle/end cover
assembly. The secondary fuel nozzle tip will start to engage or set in place when the secondary
nozzle assembly flange is approximately 0.5 inch from the primary fuel nozzle flange. Before this
engagement point, make sure that the alignment is correct.
CAUTION
If more than hand force is required to bring the secondary
nozzle body flange to the cover gasket, it is misaligned!
Stop and realign to prevent damage. Hold nozzle body in
place until one bolt is fully installed.
3. Install the remaining mounting bolts and progressively torque the bolts in a criss-cross sequence.
4. Proceed to install the rest of the secondary nozzles.
Operation 9 — How to Reconnect the False Start Drain Lines
1. Reconnect the false start drain lines to combustion casing covers 3, 4, 5, 6 and 7.
2. Tighten the swagelok nut until the collar cannot be rotated by hand.
Operation 10 — How to Install the 11th Stage Cooling and Sealing Air Lines
1. On reassembly of piping, use new gaskets on all gasketed joints.
2. Assemble 11th stage piping removed being careful to replace orifices in their proper location
from where they were removed at disassembly.
Note:
In the event that the location identification of the orifices become lost,
refer to the Reference Drawings volume of this Service Manual. The
cooling and sealing air piping diagram in this section will give the prop-
er location and orifice sizes required.
Operation 11 — How to Install the Primary, Secondary and Transfer Gas Fuel Lines
1. Using new gaskets, connect the flexible gas fuel lines between the fuel nozzle flange and the man-
ifold flange.
2. The order of installation of these flexible gas lines is generally from the bottom of the turbine to
the top, and from the radial inside to the radial outside.
3. Tighten bolts in a criss–cross pattern to give uniform gasket compression.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...