Inspection and Maintenance — GEK 107048
Major Inspection — Disassembly Procedures
MI-D-22
ing. Later vintage units the upper half bearing liner is bolted to the low-
er half bearing liner.
1. Disconnect and tag any instrumentation on the upper half bearing housing.
2. Loosen and remove the horizontal joint bolting on the number one bearing housing. See Figure
MI-D.10.
3. Install jacking bolts and jack the housing apart 0.100 in. or less to separate the horizontal joint.
4. Rig to lift the housing, using a chainfall, and lift the housing clear of the unit. Set the housing on
suitable blocking or plywood to protect from damage.
5. Unbolt and remove the upper half bearing liner from the lower half liner (if applicable).
6. Cover the open bearing housing to protect the rotor bearing journal and to keep the housing clean.
7. Identify wrap and/or cover the removed parts for protection.
Number One Bearing Housing Thrust Bearings
1. Remove the active tilted pad thrust bearing from the bearing housing by carefully sliding out the
top three pads, rotating the cage to the split line, and lifting off the top of the cage.
2. Roll out the lower half cage and remove each pad as they become accessible.
3. Identify and tag the parts removed for reassembly.
4. Wrap the thrust bearing with protective wrap to prevent damage to parts.
5. Remove the upper and lower half tapered land inactive thrust bearing.
6. Identify and tag the parts removed for reassembly.
7. Wrap the thrust bearing with protective wrap to prevent damage to parts.
8. Cover the open lower half bearing housing to protect the bearing journal and keep the housing
clean.
Number Two Bearing
Note:
The number two bearing is accessible for disassembly and reassembly
during major inspection since the exhaust frame is disassembled, how-
ever special fixturing (tooling) is provided to disassemble and reas-
semble the number two bearing with the exhaust frame in place.
1. Loosen and remove the horizontal bolts from the bearing housing. See Figure MI-D.11 and
MI-D.12.
2. Using jack bolts, jack the housing apart to separate the horizontal joint.
3. Rig to lift the housing, using a chain fall, and lift the housing clear of the unit.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...