Inspection and Maintenance — GEK 107048
Hot Gas Path Inspection — Disassembly Procedures
HGP-D-2
2. On side exhaust configurations remove any architectural lagging and support members which
may interfere with turbine casing removal.
Note:
Before the removable panel on the forward wall of the units exhaust
plenum can be removed, the upper section (right side looking with air
flow) of the 11th stage extraction piping and compressor bleed valve
(33CB-2) must be removed.
3. Disconnect the tubing runs attached to the head of the bleed valve and the tubing runs attached
to the extraction piping at both ends. Remove the “U” bracket that supports the actuating cylinder,
loosen the slip joint clamp and unbolt the extraction line from the compressor casing.
4. Rig to remove the piping, slip the piping out of the expansion joint and lift the piping clear of the
unit. Set the piping on suitable material to protect the valve and tubing runs. Cover all openings
on piping and compressor casing.
5. Remove the forward upper half segment clamp bars and the flex seal plates between the exhaust
hood frame and exhaust plenum.
6. Unbolt the forward exhaust plenum removable access panel. Rig to lift the panel.
Note:
The compressor bleed valve discharge pipe, insulating packs and the
compressor bleed valve diffuser box are part of this panel and should
not have to be removed.
7. Install a length of 4 in. pipe or timber and 10 ton mechanical jack across the horizontal opening
of the plenum and spread the plenum sufficiently enough to remove the access panel. Lift panel
clear of the unit.
8. Unbolt and remove the inlet plenum access door located in the lower right hand section of the
plenum, looking with air flow.
Operation 3 — How to Take Initial Compressor and Turbine Rotor Positioning Checks
Note:
Rotor positioning checks must be done with all casings bolted in place
and unit supported on its own supports.
CAUTION
Do not confuse clearanceometer holes and probe holes.
Clearanceometer holes are too small for a depth microme-
ter. Use probe holes for taking tip clearances on turbine
and compressor.
1. Using random first-stage compressor blades, take feeler clearance checks at six points: top cen-
terline, bottom centerline, and above and below the horizontal joint on each side. Record clear-
ances on PGS/GT-FF-6094 Inspection Form.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...