Inspection and Maintenance
Inspection and Maintenance Procedures
IMP–21
be maintained at 50 percent or less to minimize any possible corrosion problems. Conformal coatings
are used to protect electronic equipment; however, high relative humidity can cause accelerated corro-
sion in any area not properly protected.
Refer to SPEEDTRONIC Maintenance Manual Procedures in Volume I.
Relay Contacts
Contact Cleaning
The relay contact(s) must be clean and free from dust to energize the load device. The main source
of problems with relays is dirty load contacts. Many industrial relays (such as the type HGA relay)
are furnished with a dust-tight cover. Open-type relays, particularly in a dust-laden atmosphere,
should be cleaned at regular intervals. The removable contact carriage should also be checked for
mechanical freedom and alignment with the stationary contacts.
A common error in maintenance is the belief that service-roughened contacts must be filed smooth.
A roughened contact will carry current as well as a smooth contact; therefore, a contact roughened
by normal arcing should not be serviced. However, if a contact is deformed by unusual arcing and
has developed a large projection, it should be repaired as described below.
Silver contacts oxidize more slowly than copper ones and form a self-reducing oxide. Filing is,
therefore, not recommended, since it can completely destroy the silver contact’s usefulness.
If it is necessary to clean the silver contact, use a burnishing tool. This tool consists of a flexible strip
of metal, with an etched (roughened) surface, similar to a superfine file. Do not clean the contact
with knives, files, or abrasive paper or cloth.
Copper contacts oxidize rapidly at elevated temperatures, forming a very high resistance oxide. A
few strokes with a file will remove the oxide and reduce the resistance. Usually, it is not necessary
to file contacts if the device is operated often. The slight abrasion produced by an ordinary closing
operation is sufficient to keep the oxide cleaned off.
Contact Replacement and Pressure
Since short-circuit currents, that flow through a relay’s contacts, can completely melt or weld them
closed, relays, or relay contacts, should be replaced if evidence requires it.
As the contact wears, the pressure of the movable contact (when closed) is maintained against the
stationary one by the wiping springs. Inspection of the spring is necessary, since heating may cause
tempering and eventually reduce the pressure. The correct spring pressure is usually shown in the
instruction sheet accompanying the relay. (See Volume II of the Service Manual.) Also, the contact
spring pressure on one pole can be compared to the pressure on the other poles of the same contact.
The spring pressure on all poles should be approximately the same. If one is considerably lower,
the contact should be replaced.
Contact Arcing
Another problem, associated with the relay load contacts, is excessive arcing. This arcing occurs
when the contacts open an inductive load, such as an ignition transformer, or a small dc motor field.
The resulting voltage ionizes, or breaks down, the air between the contacts and an arc is established.
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...