5 - 1 5
5
Installation and Wiring
3
To adopt bottom wiring, remove the three bottom covers shown in
Figure 5-14
.
Each bottom cover has 2 screws. For bottom entry, please refer to
Figure 5-15
.
After wiring, close the front door.
(20 ~ 120kVA UPS Internal View with
Front Door Open &
Wiring Terminal Cover Removal)
Bottom Cover × 3
(Each Cover Has
Two Screws)
(Figure 5-14: Location of Bottom Covers)
Internal View (with Front Door Open &
Wiring Terminal Cover Removal)
Bottom Entry
(Figure 5-15: Bottom Entry)
4
For wiring terminals and wiring information, please refer to
Table 5-3
and also cross-
refer to
Figure 5-8
~
Figure 5-19
.
Table 5-3: Wiring Terminals & Wiring Information
No.
Item
Description
Function
1
AC Input
Terminals
Include L1/ L2/ L3/ N
terminals.
Connect to the main AC source.
2
Bypass Input
Terminals
Include L1/ L2/ L3/ N
terminals.
1. For single input, there is no
need to connect the Bypass
Input terminals.
2. For dual input, connect to the
bypass AC source.
3
UPS Output
Terminals
Include L1/ L2/ L3/ N
terminals.
Connect to the critical loads.
Содержание Modulon DPH series
Страница 26: ......
Страница 58: ......
Страница 168: ......
Страница 237: ...8 1 8 Optional Accessories 8 Optional Accessories...
Страница 240: ......
Страница 241: ...9 1 9 Maintenance Maintenance 9...
Страница 243: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1 A1...
Страница 246: ......
Страница 247: ...A2 1 Appendix 2 Warranty Warranty A2 A2...
Страница 250: ......