CCI.Cam
CCI.Cam
– Operation
10
4.2.1
Select full-screen mode
To select the
full-screen mode
, proceed as follows:
1. In the touchscreen press on the button "
Full screen mode
" (F8), directly on the
camera image display or on the scroll wheel.
→ The view changes immediately to
full-screen mode
, the camera image
takes up the entire monitor area.
Note
In
full-screen mode
, the "Mirror image" (F9) and "Snapshot" (F11) functions are
only available via the corresponding function keys.
Note
To exit
full-screen mode
, touch any area in the touchscreen or press the F8
function key or the scroll wheel.
4.2.2
Mirror image
To mirror the image along the vertical axis, proceed as follows:
1. Press the "Mirror image" button (F9) on the
touchscreen
.
→ The image is displayed as a mirror image.
4.2.3
Take a snapshot
To take a
snapshot
, proceed as follows:
1. Connect a flash drive to the
terminal
.
2. Press the "Take a Snapshot" button (F11) on the
touchscreen
.
→ The
snapshot
will be automatically saved to the flash drive in the
"CAMCAP" folder. The filenames follow the convention
<img>_<JJJJ_MM_TT>_<consecutive number>JPEG.
Содержание CCI 50
Страница 2: ...CCI 50 ISOBUS Terminal Operating instructions Reference Release 5 50...
Страница 30: ...23 5 1 User settings The operating characteristics of the terminal are set under the tab User settings...
Страница 62: ...55 A Appendix Menu structure...
Страница 64: ...CCI Cam Visual implement monitoring Operating instructions Reference CCI Cam v5...
Страница 90: ...CCI Control Documentation and task management Operating instructions Reference CCI Control v4...
Страница 196: ...107 10 Notes...
Страница 199: ...110 Edit 38...
Страница 200: ...CCI TECU Tractor data Operating instructions Reference CCI TECU v6...
Страница 218: ...CCI TECU Operation 19 4 3 3 1 Overview This tab shows the settings for speed the power take off and the 3 point hitch...
Страница 244: ...CCI Command GPS track guiding and section control Operating instructions Reference CCI Command v4...
Страница 334: ...91 Mark line Change the position of the marker Move reference track to the left Move reference track to the right...
Страница 338: ...CCI GPS GPS settings and tractor geometry Operating instructions Reference CCI GPS v2...
Страница 339: ...Copyright 2015 Copyright by Competence Center ISOBUS e V Albert Einstein Stra e 1 D 49076 Osnabr ck Version number v2 05...