
24.
Place into operating position (continued)
Replace and tighten the two screws
(B)
that
secure the system unit
(A)
to the rack.
25.
Install the control panel
1.
Carefully slide the control panel partially
into the control panel bay.
2.
Connect the control panel cables
(A)
to the
control panel.
3.
Continue sliding the control panel into the
bay until you feel the control panel lock
into place.
56
Power Systems: IBM Power 550 Express (8204-E8A and 9409-M50) removal and replacement procedures
Содержание ESCALA PL860T/R
Страница 1: ...ESCALA ESCALA PL860T R Removal and Replacement Procedures REFERENCE 86 A1 88FA 01...
Страница 2: ......
Страница 6: ...iv Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 194: ...186 Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 217: ......
Страница 218: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 88FA 01...