
10.
Place into service position
Note to Tower Users:
The instructions in this
procedure are written based on the rack
model. Tower users may still use this
procedure. However, Tower users should
ignore specific references to rack-only features
such as rack doors, rack thumbscrews, and
rack-specific FRU orientation, etc.
Attention:
When placing the model rack into
the service position, it is essential that all
stability plates are firmly in position to
prevent the rack from toppling. Ensure that
only one system unit is in the service position
at a time.
Remove two screws
(A)
securing the system
unit
(B)
to the rack.
11.
Place into service position (continued)
While holding the system unit release latches
(A)
down on both the left and right sides, pull
the system unit
(B)
out from the rack until the
rails are fully extended and locked.
Notes:
1.
Ensure that the cables at the back of the
system unit do not catch or bind as you
pull the unit forward in the rack.
2.
When the system unit rails are fully
extended, the rail safety latches lock into
place. This action prevents the system
from being pulled out too far.
18
Power Systems: IBM Power 550 Express (8204-E8A and 9409-M50) removal and replacement procedures
Содержание ESCALA PL860T/R
Страница 1: ...ESCALA ESCALA PL860T R Removal and Replacement Procedures REFERENCE 86 A1 88FA 01...
Страница 2: ......
Страница 6: ...iv Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 194: ...186 Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 217: ......
Страница 218: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 88FA 01...