
18.
Place into operating position
1.
To unlock the rail safety latches
(B)
, slide
the latches towards the front of the
system.
2.
Push the system unit
(A)
back into the
rack until both system-unit release latches
have locked into position.
Note:
Ensure that the cables at the back of
the system do not catch or bind as you
push the system unit back into the rack.
19.
Place into operating position (continued)
Replace and tighten the two screws
(B)
that
secure the system unit
(A)
to the rack.
22
Power Systems: IBM Power 550 Express (8204-E8A and 9409-M50) removal and replacement procedures
Содержание ESCALA PL860T/R
Страница 1: ...ESCALA ESCALA PL860T R Removal and Replacement Procedures REFERENCE 86 A1 88FA 01...
Страница 2: ......
Страница 6: ...iv Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 194: ...186 Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 217: ......
Страница 218: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 88FA 01...