
1.
Remove the front cover
Note to expansion unit users:
The
instructions in this procedure are written
based on the rack model. Tower users may
still use this procedure. However, expansion
unit users should ignore specific references to
rack-only features such as rack doors, rack
thumbscrews, rack-specific FRU orientation,
and so on.
1.
Open the front rack door.
2.
Remove the two thumbscrews
(A)
that
secure the system unit
(B)
to the rack.
3.
Push the cover release latches
(C)
in the
direction of the arrows to release the cover
from the system unit.
4.
Pull the cover out and away from the
system unit.
2.
Determine if repair can continue concurrently
You must determine if the repair can continue
concurrently. If the top LED is green as shown
in the graphic on the right, you may proceed
with a concurrent repair. Otherwise, the repair
can continue only after powering off the unit.
If the unit is already powered off, you may
proceed with a nonconcurrent repair.
3.
Select an action:
Nonconcurrent repair.
Power off the unit and
continue the repair.
Concurrent repair.
Continue the repair
with unit power on.
Delay the repair.
114
Power Systems: IBM Power 550 Express (8204-E8A and 9409-M50) removal and replacement procedures
Содержание ESCALA PL860T/R
Страница 1: ...ESCALA ESCALA PL860T R Removal and Replacement Procedures REFERENCE 86 A1 88FA 01...
Страница 2: ......
Страница 6: ...iv Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 194: ...186 Power Systems IBM Power 550 Express 8204 E8A and 9409 M50 removal and replacement procedures...
Страница 217: ......
Страница 218: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 88FA 01...