6-24
Section 6
Maintenance
Before you fill the freshwater system, it is vital that it be
properly disinfected.
The following procedure is recommended to disinfect the
freshwater system:
lush the entire system thoroughly by allowing potable
water to ow through it.
Drain the system completely.
ill the entire system with an approved disinfecting
solution and follow the method prescribed by the
manufacturer.
After disinfecting, drain the entire system.
lush the entire system thoroughly several more
times with potable water.
Now the system is ready for use fill with potable
water.
This should be done annually or before using the system
if it has been laid up for an e tended amount of time.
As a precaution against accidental ooding, remove the
hose when leaving the boat for an e tended period of
time.
Water H eater
Make sure the fresh water tank is full b efore
op erating the water heater. O p erating the water
heater emp ty will cause damage to the system.
H ydrogen gas may form in the tank if the system
has not b een used for more than two weeks.
O NOT smoke or have any ame near an open
faucet.
CAUTION
AN E
Содержание 37 Justice Series
Страница 24: ...Section 1 Safety 1 12 O p erator s Notes...
Страница 56: ...Section 2 Boat O p eration 2 32 O p erator s Notes...
Страница 60: ...3 4 Section 3 F uel System Diesel F uel System Diagram F O RWARD...
Страница 61: ...3 5 F uel System Section 3 Gasoline F uel System Diagram F O RWARD...
Страница 74: ...4 2 Section 4 Boat Systems...
Страница 75: ...4 3 Boat Systems Section 4...
Страница 76: ...4 4 Section 4 Boat Systems...
Страница 77: ...4 5 Boat Systems Section 4...
Страница 78: ...4 6 Section 4 Boat Systems...
Страница 107: ...4 35 Boat Systems Section 4 F O RWARD...
Страница 134: ...4 62 Section 4 Boat Systems O p erator s Notes...
Страница 145: ...5 11 Electrical Systems Section 5 Main DC Breaker Panel...
Страница 146: ...5 12 Section 5 Electrical Systems Main AC Breaker Panel...
Страница 148: ...5 14 Section 5 Electrical Systems H elm Breaker Panel...
Страница 149: ...5 15 Electrical Systems Section 5 L eaning Post Breaker Panel...
Страница 150: ...5 16 Section 5 Electrical Systems Battery Switch Breaker Panel...
Страница 155: ...5 21 Electrical Systems Section 5 Battery System Diagram...
Страница 156: ...5 22 Section 5 Electrical Systems Battery Switch Panel Diagram...
Страница 157: ...5 23 Electrical Systems Section 5 H elm Breaker Panel Diagram...
Страница 158: ...5 24 Section 5 Electrical Systems H elm Switch Panel Diagram...
Страница 159: ...5 25 Electrical Systems Section 5 L eaning Post Switch Panel Diagram...
Страница 160: ...5 26 Section 5 Electrical Systems L ighting Schematic Deck...
Страница 161: ...5 27 Electrical Systems Section 5 Windlass Schematic...
Страница 162: ...5 28 Section 5 Electrical Systems O verb oard Discharge Panel and H olding T ank Schematic...
Страница 163: ...5 29 Electrical Systems Section 5 DC Distrib ution Panel...
Страница 164: ...5 30 Section 5 Electrical Systems DC Wiring Schematic Cab in...
Страница 165: ...5 31 Electrical Systems Section 5 H ardtop Schematic...
Страница 166: ...5 32 Section 5 Electrical Systems 120 0 Shore ower Schematic...
Страница 167: ...5 33 Electrical Systems Section 5 AC Distrib ution Panel 120 0...
Страница 168: ...5 34 Section 5 Electrical Systems 220 0 Shore ower Schematic...
Страница 169: ...5 35 Electrical Systems Section 5 AC istribution anel 220 0...
Страница 170: ...5 36 Section 5 Electrical Systems Bow T hruster Schematic...
Страница 171: ...5 37 Electrical Systems Section 5 Bilge Wiring Schematic...
Страница 172: ...5 38 Section 5 Electrical Systems Stereo Schematic...
Страница 178: ...5 44 Section 5 Electrical Systems O p erator s Notes...
Страница 212: ...6 34 Section 6 Maintenance Operator s Notes...
Страница 214: ......