![Azbil MagneW Neo PLUS Скачать руководство пользователя страница 267](http://html1.mh-extra.com/html/azbil/magnew-neo-plus/magnew-neo-plus_user-manual_3042666267.webp)
Model MTG11A/18A, MTG11B/18B, MTG14C
7-1
Chapter 7 : Operation using HART
communicator
7-1 : Preparation for communication, verification
and cautions on use
This section describes the preparation necessary for communication between a device
and a HART Communicator. This section also covers the procedure to verify
communication. The first step for preparation is to perform wiring between the
converter and the HART Communicator. After wiring has been completed, turn the
power on and verify that communications are functioning properly.
7-1-1 : Wiring between converter and HART Communicator
The following describes the methods of wiring between converter and HART
Communicator.
Connect the HART Communicator as shown in Figure 7-1. A 250
Ω
resistor must be
installed on the receiving end of the output current. There is no polarity on the HART
Communicator terminal.
Figure 7-1 HART Communicator wiring
24V DC
7
A B
C
8
HART Communi
cator
9
G H
I
4
J K
L
5
M
N
O
6
P Q
R
1
S T
U
2
V W
X
3
Y Z
/
0
# %
&
.
<
>
_
*
: +
D E
F
O
I
FIE
LD
C
OM
M
UN
ICA
TIO
NS
PR
OT
OC
OL
F4
F3
F1
F2
MTG
Converter
I.OUT +
I.OUT -
HART communicator
250
Ω
Host control
system
+
-
CM2-MTG300-2001.book 1 ページ 2015年9月29日 火曜日 午前10時14分
Содержание MagneW Neo PLUS
Страница 16: ...List of Figures Tables CM2 MTG300 2001 book 4...
Страница 92: ...MEMO CM2 MTG300 2001 book 38...
Страница 106: ...MEMO CM2 MTG300 2001 book 4...
Страница 266: ...MEMO CM2 MTG300 2001 book 82...
Страница 312: ...MEMO CM2 MTG300 2001 book 46...
Страница 336: ...MEMO CM2 MTG300 2001 book 22...
Страница 338: ...CM2 MTG300 2001 book 2...