E 740
Greasing molecular and
turbomolecular pumps
G
B
01240
-
E
d
it
io
n
04
-
J
ui
n
08
After relubricating, the P0326 board could not allow you to success
the first or second leak detector starting. Why ? When you use
a grease syringe, there is a grease accumulation on one point of
the ball bearing, and so a small hard point, which will disappear
progressively during the grease repartition.
What should you do ? Just after relubrication, set the pump going with
your hand few minutes before to replace it (if it was removed from the
leak detector) or to take off the flexible (if it was not removed from the
leak detector) : in this case, try to start the pump before removing the
flexible : it is not a destroying test. You can also use a turbo converter
(more powerful for this first critical half turn). After you should also
keep the leak detector running 2 or 3 hours before stopping it.
Adjust the
correspondance
between the different
test modes
The internal parameters allow a correspondance of the different test
modes depend on the pump.
That’s why after every intervention of the pump it is indispensable to
for new adjustment
E 430.
4/5
Содержание ASM 142
Страница 1: ...ASM 142 142 D ASM GRAPH GRAPH D GRAPH D HELIUM LEAK DETECTOR User s Manual ...
Страница 98: ......
Страница 106: ......
Страница 111: ......
Страница 119: ......
Страница 124: ......
Страница 129: ......
Страница 140: ......
Страница 144: ......
Страница 166: ......
Страница 315: ...G 201 Wiring diagrams ASM 142 D index 1 2 ...