A 600
Options
F1
F2
F3
F4
GB
02446
-
E
d
it
io
n
04
-
J
une
08
Control panel with
graphic interface
The control panel with graphic interface is equipped with a color
touch screen. It allows it to have, as a supplement to the standard
control panel functions, a graphic interface.
12
mbar.l/s
LEAK RATE
COR
Pa.m
3
/s
Torr.l/s
10
-12
10
-11
10
-10
10
-9
10
-8
10
-7
10
-6
10
-5
10
-4
10
-3
10
-2
STDBY
EVAC TEST
SET POINTS
SPECTRO
MAINTENANCE
OTHER
AUTO CAL
SNIFFER
ZERO
CYCLE
Control panel racks
13
The leak detector is delivered with 5 m (16 Ft) or 10 m (32 Ft) cables.
Standard
The standard control panel rack allows to manage the detector:
setting, test, calibration, ...
LEAK RATE
COR
mbar.l/s
Pa.m
3
/s
Torr.l/s
10
-12
10
-11
10
-10
10
-9
10
-8
10
-7
10
-6
10
-5
10
-4
10
-3
10
-2
10
-3
10
-2
10
-1
1 10
1
10
2
10
3
mbar
hPa
Torr
STDBY
EVAC TEST
NEXT
-
+
RESET
INLET PRESSURE
SET POINTS
SPECTRO
MAINTENANCE
OTHER
AUTO CAL
SNIFFER
ZERO
CYCLE
Touchscreen The control panel with graphic interface is equipped with a color
touch screen. It allows it to have, as a supplement to the standard
control panel functions, a graphic interface.
mbar.l/s
LEAK RATE
COR
Pa.m
3
/s
Torr.l/s
10
-12
10
-11
10
-10
10
-9
10
-8
10
-7
10
-6
10
-5
10
-4
10
-3
10
-2
STDBY
EVAC TEST
SET POINTS
SPECTRO
MAINTENANCE
OTHER
AUTO CAL
SNIFFER
ZERO
CYCLE
4/5
Содержание ASM 142
Страница 1: ...ASM 142 142 D ASM GRAPH GRAPH D GRAPH D HELIUM LEAK DETECTOR User s Manual ...
Страница 98: ......
Страница 106: ......
Страница 111: ......
Страница 119: ......
Страница 124: ......
Страница 129: ......
Страница 140: ......
Страница 144: ......
Страница 166: ......
Страница 315: ...G 201 Wiring diagrams ASM 142 D index 1 2 ...