ANSI10000240-2-en.vsd
Samples:
Generator
terminal
voltage
3rd
harmonic
Fourier
filtering
giving VT3
Complex VT3
Samples:
Generator
neutral point
voltage
3rd
harmonic
Fourier
filtering
giving VN3
Complex VN3
Stator
Ground
Fault
detection
3rd
harmonic
based
Pickup
Pickup
and trip
logic
TRIP
TRIP3H
TRIPVN
PU3H
PU_VN
Fundamental frequency residual
voltage
Stator
Ground
Fault
detection
95 %
Pickup
52a
BLOCK
PICKUP
ANSI10000240 V2 EN
Figure 145:
Simplified logic diagram for stator ground fault protection
STEFPHIZ (59THD) function can be described in a simplified logical diagram as shown
in figure
. Note that the 3rd harmonic numerical filters are not part of the stator ground-
fault protection function.
These third harmonic voltages are calculated by the preprocessing blocks connected to the
function.
Section 9
1MRK 502 048-UUS A
Voltage protection
316
Technical manual
Содержание 650 series
Страница 1: ...Relion 650 series Generator protection REG650 ANSI Technical manual ...
Страница 2: ......
Страница 44: ...38 ...
Страница 62: ...56 ...
Страница 68: ...62 ...
Страница 156: ...150 ...
Страница 198: ...192 ...
Страница 512: ...506 ...
Страница 644: ...638 ...
Страница 714: ...708 ...
Страница 777: ...771 ...