![ABB 650 series Скачать руководство пользователя страница 299](http://html.mh-extra.com/html/abb/650-series/650-series_technical-manual_2503299.webp)
value, and the highest voltage is used for the inverse time characteristic integration. A
special logic is included to achieve the
1 out of 3
,
2 out of 3
or
3 out of 3
criteria to fulfill the
PICKUP condition. The design of Two step overvoltage protection (OV2PTOV, 59) is
schematically described in
.
PICKUP
PU_ST1_A
PU_ST1_B
PU_ST1_C
PU_ST1
TRST1
PICKUP
PU_ST2
TRST2
TRIP
Comparator
V > Pickup1
Comparator
V > Pickup1
Comparator
V > Pickup1
MaxVoltSelector
Comparator
V > Pickup2
Comparator
V > Pickup2
Comparator
V > Pickup2
Pickup
&
Trip
Output
Logic
Step 1
Pickup
&
Trip
Output
Logic
Step 2
Phase C
Phase B
Phase A
Phase C
Phase B
Phase A
Timer
t2
Voltage Phase
Selector
OpMode2
1 out of 3
2 outof 3
3 out of 3
Time integrator
or Timer t1
Voltage Phase
Selector
OpMode1
1 out of 3
2 outof 3
3 out of 3
TRIP
TRIP
OR
OR
OR
OR
OR
OR
VA or VAB
VB or VBC
VC or VCA
ANSI08000012-3-en.vsd
PICKUP
ANSI08000012 V3 EN
Figure 135:
Schematic design of Two step overvoltage protection (OV2PTOV, 59)
1MRK 502 048-UUS A
Section 9
Voltage protection
293
Technical manual
Содержание 650 series
Страница 1: ...Relion 650 series Generator protection REG650 ANSI Technical manual ...
Страница 2: ......
Страница 44: ...38 ...
Страница 62: ...56 ...
Страница 68: ...62 ...
Страница 156: ...150 ...
Страница 198: ...192 ...
Страница 512: ...506 ...
Страница 644: ...638 ...
Страница 714: ...708 ...
Страница 777: ...771 ...