5.1.2. Are there limitations to the discharge calculation?
RiverSurveyor systems cannot measure the entire river cross-section. The “unmeasured” areas
are depicted in
•
The minimum ADP and vessel depth requirements limit the depths into which the RiverSur-
veyor system can profile. These sections, typically near the start and end positions on the
opposite riverbanks, are called the
edges
.
•
The mounting depth (i.e., transducer depth) and the ADP’s
of water near the surface unmeasured. This area is called the
top
.
•
Potential data contamination in the last cell (e.g., the cell is partially or fully “touching” the
riverbed), or potential side-lobe interference at the end of the profile, leaves a section of wa-
ter at the bottom that is unmeasured. This area is called the
bottom
.
The
RiverSurveyor
program computes discharge in the edges based on either a constant slope
bank (using a ratio-interpolation method) or a vertical wall. Discharge in the top and bottom sec-
tions is computed (based on the velocities in the measured section) using either a power-law
method or constant method. These methods are described within §
5.1.3. How do I calculate total discharge for the section using RiverSurveyor?
The
RiverSurveyor
program requires a few user entries to calculate total discharge for a section.
Discharge for the top and bottom areas is calculated based on velocities computed using the Ve-
locity Profile Extrapolation method described in §
. These estimates are automatically com-
puted during each discharge measurement.
Discharge for the left and right edges is calculated based on the currents near the sides of the
measured area. The values used in the edge discharge calculations can be input during either data
collection or post-processing. Most users will enter these values during data collection to reduce
any complications.
Figure 5-2. Cross-sectional areas not measured by the ADP
Summary of Contents for SonTek RiverSurveyor
Page 2: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 ii ...
Page 4: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 iv ...
Page 14: ......
Page 24: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 12 ...
Page 26: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 14 ...
Page 74: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 62 ...
Page 82: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 70 ...
Page 148: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 136 ...
Page 162: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 150 ...
Page 166: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 154 ...
Page 168: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 156 ...
Page 182: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 170 ...
Page 194: ...SonTek YSI Inc RiverSurveyor System Manual May 1 2007 182 ...