Maintenance schedule
March 14, 2014, 715004387 Rev. B
83
Maintenance schedule
The following table lists periodic maintenance schedules that ensure optimum
instrument performance.
The maintenance frequencies shown apply to instruments that normally
receive moderate use.
Maintenance schedule:
Procedure
Frequency
For information...
Clean the instrument case.
As required.
.
Empty the exhaust trap bottle
in the instrument exhaust
line.
Check daily, empty as
required.
.
Replace the oil-free (scroll)
pump’s seals.
Annually.
See Edwards
document
XDS35i
Instruction Manual
A730-01-880
.
Gas ballast the roughing
pump.
ESI – weekly.
.
Inspect and adjust the
roughing pump oil level.
Weekly.
.
Clean the source components. When they are visibly
fouled, the background
or high-peak
contaminants are
unacceptably high, or
sensitivity decreases to
unacceptable levels.
.
Clean or replace the ESI
probe tip.
When sensitivity
decreases to
unacceptable levels.
.
Replace the ESI probe
capillary.
When sensitivity
decreases to
unacceptable levels or
sample flow is
inconsistent.
.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...