![Waters Xevo TQD Overview And Maintenance Manual Download Page 155](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421155.webp)
Replacing the ESI probe sample capillary
March 14, 2014, 715004387 Rev. B
155
12. Unscrew the finger-tight PEEK union from the UNF coupling.
13. Remove the ferrule and PTFE liner sleeve from the capillary.
14. Remove the capillary from the UNF coupling.
15. Dispose of the capillary, PTFE liner sleeve, and ferrule in accordance
with local environmental regulations.
Installing the new capillary
Required materials
•
Chemical-resistant, powder-free gloves
•
Combined 2.5-mm Allen wrench and cone extraction tool
•
10-mm wrench
•
Needle-nose pliers
•
LC pump
•
HPLC-grade (or better) 1:1 acetonitrile/water
•
Ferrule
•
Seal
•
PTFE liner tubing
•
Conductive sleeve
•
Red PEEK tubing
•
Sharp knife or PEEK tubing cutter
•
Metal gasket for the probe tip
•
Safety goggles
Warning:
To avoid spreading contamination, dispose of the
capillary, PTFE liner sleeve, and ferrule in accordance with
local environmental regulations. The used components can
be contaminated with biohazardous or toxic materials.
Ferrule
PTFE liner sleeve
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...