![Waters Xevo TQD Overview And Maintenance Manual Download Page 154](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421154.webp)
4 Maintenance Procedures
154
March 14, 2014, 715004387 Rev. B
7. Remove the metal gasket from the probe tip.
8. Remove the PEEK union/UNF coupling assembly and capillary from the
probe.
9. Unscrew and remove the knurled collar from the UNF coupling.
10. Remove the knurled collar and conductive sleeve from the capillary.
11. Use the 7-mm wrench to loosen the locknut.
Tip:
Use the 8-mm wrench to steady the UNF coupling when loosening
the locknut.
Metal gasket
PEEK union/UNF
coupling assembly
Capillary
UNF coupling
PEEK union
Conductive sleeve
Knurled collar
Locknut
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...