![Waters Xevo TQD Overview And Maintenance Manual Download Page 235](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421235.webp)
Connecting the workstation
March 14, 2014, 715004387 Rev. B
235
Connecting the workstation
Before connecting the workstation to the instrument, set up the workstation
according to its accompanying instructions. Locate the workstation within
5 meters (16 feet) of the instrument.
Requirement:
Use shielded network cables with the instrument to reduce
susceptibility to radio and electrical frequency interference.
To connect the workstation:
1. Connect the monitor to the PC.
2. Connect one end of the shielded network cable to the appropriate port on
the rear panel of the instrument.
3. Connect the other end of the shielded network cable to the port labeled
Instrument LAN on the workstation rear panel.
To connect the instrument to the power source:
Requirement:
Do not connect the instrument’s power supply cord until
you complete the installation procedures in the previous sections.
1. Select the correct power cord for your location.
2. Connect the female end of the power cord to the power port on the rear
panel of the instrument.
Warning:
To avoid injury from electric shock or fire, and to
prevent damage to the workstation and ancillary equipment,
do not place objects filled with liquid—such as solvent
bottles—on these items, or expose them to dripping or
splashing liquids.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...