4 Maintenance Procedures
174
March 14, 2014, 715004387 Rev. B
Replacing the source assembly seals
To avoid solvent vapors of biohazards and toxic materials leaking into the
laboratory atmosphere, replace the following seals at intervals not exceeding
one year:
•
Probe adjuster assembly probe seal
•
Probe adjuster assembly nebulization gas seal
•
Source enclosure seal
•
Nebulizer gas seal
•
Desolvation gas seal
Removing the probe adjuster assembly probe and source
enclosure seals
Required materials
•
Chemical-resistant, powder-free gloves
•
O-ring removal kit
Warning:
To avoid solvent vapors of biohazards and toxic
materials leaking into the laboratory atmosphere, replace the
seals listed below exactly as described in this section.
Warning:
To avoid solvent vapors of biohazards and toxic
materials leaking into the laboratory atmosphere, replace the
seals listed below at intervals not exceeding one year.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...