B External Connections
226
March 14, 2014, 715004387 Rev. B
To connect the oil-free roughing pump:
1. Place the pump on the floor, within 1.5 m (5 feet) of the instrument.
2. Attach the NW25/NW40 adaptor to the roughing pump inlet flange
using an NW40 center ring, and then secure the connection with an
NW40 clamp, using the 7-mm nut driver to install the clamp.
3. Attach the NW25 tee to the NW25/NW40 adaptor using an NW25 center
ring, and then secure the connection with an NW25 clamp, using the
7-mm nut driver to install the clamp.
4. Using the NW25 center rings and clamp, and the 7-mm nut driver,
attach the flanged end of a length of 1-inch ID vacuum hose to the top
port on the NW25 tee, and the 10-mm reducer fitting and a length of
10-mm ID nylon tubing to the middle (perpendicular) port on the tee.
5. Using 2 hose clamps, connect the opposite end of the length of 1-inch
vacuum hose in
to the 1-inch OD straight vacuum port on the
instrument’s rear panel.
6. Connect the opposite end of the 10-mm nylon tube to the 10-mm source
vent port on the instrument’s rear panel.
7. Using 1 hose clamp, connect a length of 12.7-mm clear PVC exhaust
tubing to the roughing pump exhaust port NW25 nozzle fitting.
Warning:
To avoid personal contamination with biohazards
or toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves when working with the pump and its
connections.
Warning:
To avoid skeletal or muscle injury, at least two
people must lift the pump.
Notice:
To prevent serious damage to the instrument, two
separate exhaust systems are required: one for nitrogen, the other
for the roughing pump. Vent the exhausts to atmosphere through
separate lines. Oil mist can seriously damage the instrument if the
nitrogen exhaust line connects with the roughing pump exhaust
line. Your warranty does not cover damage caused by routing
exhaust lines incorrectly.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...