![Waters Xevo TQD Overview And Maintenance Manual Download Page 71](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421071.webp)
Combined APPI/APCI source
March 14, 2014, 715004387 Rev. B
71
Installing the combined APPI/APCI source
Required material
Chemical-resistant, powder-free gloves
To install the combined APPI/APCI source:
1. Prepare the instrument for working on the source (see
2. Remove the probe from the currently installed source.
•
If you are removing an ESI probe, see
•
If you are removing an IonSABRE II probe, see
3. Remove the existing source enclosure (see
).
4. Install the combined APPI/APCI source enclosure (see
5. Install the corona pin (see
).
6. Connect the APPI drive cable to the instrument’s front panel connector.
Warning:
To avoid personal contamination with biohazards or
toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves while performing this procedure. The source
components can be contaminated.
Warning:
To avoid electric shock, before beginning this procedure,
prepare the instrument according to the procedure on
,
“Preparing the instrument for operations on or inside its source”
.
Warning:
To avoid burn injuries, take great care while working
with the probe and source; these components can be hot.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...