![Waters Xevo TQD Overview And Maintenance Manual Download Page 163](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421163.webp)
Replacing the IonSABRE II probe sample capillary
March 14, 2014, 715004387 Rev. B
163
To install the new capillary:
1. Use the sharp knife or PEEK tubing cutter to cut a piece of red PEEK
tubing approximately 60 cm (24 inches) long.
Requirement:
Cut the tubing squarely (that is, perpendicular to its
horizontal axis).
2. Insert one end of the red PEEK tubing in the probe inlet connector, and
screw the connector, finger-tight, into the PEEK union.
Rationale:
Doing so ensures a minimum dead volume when fitting the
capillary.
3. Fit the UNF coupling to the new capillary.
Requirement
: Use a UNF coupling with no grooves, which is appropriate
for the IonSABRE II probe.
Warning:
To avoid personal contamination with biohazards or
toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves when working with the probe and source
components.
TP02671
Probe inlet connector
PEEK tubing
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...