Connecting the liquid waste line
March 14, 2014, 715004387 Rev. B
233
Connecting the liquid waste line
Required material
Chemical-resistant, powder-free gloves
To connect the liquid waste line:
1. Place a suitable waste container below the instrument.
2. Slide a drain line over the barbed fitting of the drain (located at the
bottom of the instrument).
Warning:
To prevent personal contamination with biohazards or
toxic materials, always wear chemical-resistant, powder-free
gloves while performing this procedure. The waste line and
connection can be contaminated.
Notice:
To avoid distorting the drip tray or causing the drain cup
to leak, restrain the drain cup when attaching or removing the
waste line.
TP02684
Drain cup
Barbed fitting
Drain line
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...