![Waters Xevo TQD Overview And Maintenance Manual Download Page 79](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421079.webp)
NanoFlow source
March 14, 2014, 715004387 Rev. B
79
Recommendation:
When using a GELoader tip, break the glass
capillary in half, scoring it with a fused silica cutter so that the
GELoader can reach the capillary’s tip.
9. Thread the knurled nut and approximately 5 mm of conductive
elastomer over the blunt end of the capillary.
10. Fit the capillary into the holder (probe).
11. Finger-tighten the nut so that 5 mm of glass capillary protrude from its
end.
Tip:
Measure the protrusion from the end of the nut to the shoulder of
the glass capillary.
Sprayer assembly:
12. Screw the sprayer back into the assembly.
13. Replace the sprayer cover.
14. On the ES+/- Source tab of the MassLynx MS Tune window, ensure that
the Capillary parameter is set to 0 kV.
5 mm
PTFE tubing
Ferrule
Union
Knurled nut
Blue conductive elastomer
Glass capillary
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...