![Waters Xevo TQD Overview And Maintenance Manual Download Page 47](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421047.webp)
Starting the mass spectrometer
March 14, 2014, 715004387 Rev. B
47
3. Power-on the workstation, and log in.
4. Press the power switch on the top, right-hand side of the mass
spectrometer and the switches on the top, left-hand sides of the
ACQUITY instruments.
Result:
Each system instrument runs a series of startup tests.
5. Allow 3 minutes for the embedded PC (located inside the mass
spectrometer) to initialize and to sound an alert indicating that the PC is
ready.
Tip:
The power and status LEDs change as follows:
•
Each system instrument’s power LED shows green.
•
During initialization, the binary or quaternary solvent manager’s
and sample manager’s status LED flashes green.
•
After the instruments successfully power-on, all power LEDs show
steady green. The binary solvent manager’s flow LED, the sample
manager’s run LED, and the mass spectrometer’s Operate LED
remain off.
6. Start the MassLynx or UNIFI software, and monitor the Instrument
Console software for messages and LED indications.
Summary of Contents for Xevo TQD
Page 2: ...ii March 14 2014 715004387 Rev B...
Page 22: ...xxii March 14 2014 715004387 Rev B...
Page 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Page 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Page 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Page 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Page 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...