
3 Maintaining the 30-cm single-zone column manager
84
October 7, 2014, 715004178 Rev. B
4. Close the column-compartment drawer, and push downward on the
handle, to secure the latch.
5. Close the outer door of the CM-30S.
Replacing the column-outlet tubing in a CM-30S installed
in a UPC
2
system
Required materials
•
Gloves: clean, powder-free, chemical-resistant
•
Replacement column-outlet tubing
Warning:
To prevent burn injuries, set the column temperature to Off,
and then allow the column compartment and its components to cool for
60 minutes before touching them. Monitor the column compartment’s
internal temperature to ensure all components are cool.
Notice:
To prevent contaminating system components, wear clean,
chemical-resistant, powder-free gloves when replacing the
passive-preheater assembly.
Drawer handle
Summary of Contents for ACQUITY CM-30S
Page 2: ...ii October 7 2014 715004178 Rev B...
Page 10: ...x October 7 2014 715004178 Rev B...
Page 14: ...xiv October 7 2014 715004178 Rev B...
Page 126: ...3 Maintaining the 30 cm single zone column manager 126 October 7 2014 715004178 Rev B...
Page 138: ...A Safety Advisories 138 October 7 2014 715004178 Rev B...
Page 146: ...B Specifications 146 October 7 2014 715004178 Rev B...