
Installing the waste tubing
October 7, 2014, 715004178 Rev. B
35
To install and route the waste tubing:
1. Wet the barbed drain fitting located at the bottom of the CM-30S using
methanol.
2. Slide the waste tubing over the barbed drain fitting, and route the
tubing to a suitable waste container.
Barbed drain fitting
Summary of Contents for ACQUITY CM-30S
Page 2: ...ii October 7 2014 715004178 Rev B...
Page 10: ...x October 7 2014 715004178 Rev B...
Page 14: ...xiv October 7 2014 715004178 Rev B...
Page 126: ...3 Maintaining the 30 cm single zone column manager 126 October 7 2014 715004178 Rev B...
Page 138: ...A Safety Advisories 138 October 7 2014 715004178 Rev B...
Page 146: ...B Specifications 146 October 7 2014 715004178 Rev B...