
Wetted materials of construction
October 7, 2014, 715004178 Rev. B
145
Wetted materials of construction
The following table lists the wetted materials of construction for the CM-30S.
Audible noise (per module)
<58 dB(A)
Test conditions:
• Measured at 1 meter standing in
front of the CM-30S.
• CM-30S in idle mode.
• Valves not operating.
Wetted materials of construction in a CM-30S installed in an APC system:
Description
Specification
Wetted materials
316 stainless steel, DLC
Wetted materials of construction in a CM-30S installed in a UPC
2
system:
Description
Specification
Wetted materials
316 stainless steel, DLC, PEEK
TM
Performance specifications: (Continued)
Item
Specification
Summary of Contents for ACQUITY CM-30S
Page 2: ...ii October 7 2014 715004178 Rev B...
Page 10: ...x October 7 2014 715004178 Rev B...
Page 14: ...xiv October 7 2014 715004178 Rev B...
Page 126: ...3 Maintaining the 30 cm single zone column manager 126 October 7 2014 715004178 Rev B...
Page 138: ...A Safety Advisories 138 October 7 2014 715004178 Rev B...
Page 146: ...B Specifications 146 October 7 2014 715004178 Rev B...