WAGO-I/O-SYSTEM 750
Mounting
63
750-806 Fieldbus Controller DeviceNet
TM
Manual
Version 2.0.0
5.6.3
Inserting the I/O Module
1.
Position the I/O module so that the tongue and groove joints to the fieldbus
coupler/controller or to the previous or possibly subsequent I/O module are
engaged.
Figure 32: Insert I/O Module (Example)
2.
Press the I/O module into the assembly until the I/O module snaps into the
carrier rail.
Figure 33: Snap the I/O Module into Place (Example)
With the I/O module snapped in place, the electrical connections for the data
contacts and power jumper contacts (if any) to the fieldbus coupler/controller or to
the previous or possibly subsequent I/O module are established.