106 Programming the PFC Using WAGO-I/O-PRO
WAGO-I/O-SYSTEM 750
750-806 Fieldbus Controller DeviceNet
TM
Manual
Version 2.0.0
9.5
Transfer the IEC program to the Fieldbus controller
Transfer from the PC to the fieldbus controller of the program for the created IEC-
61131-3 application can be performed two ways (see following sections).
•
Direct transfer via serial port
•
Transfer via fieldbus
Suitable communication drivers are required for transfer; these can be loaded and
configured using WAGO-I/O-
PRO
.
Check/adjust communications parameters of the driver
When selecting the desired driver, watch for the proper settings and adjustments
of the communications parameters (see the following description).
“Reset” and “Start” are required to set the physical outputs!
The initialization values for the physical outputs are not set immediately after
downloading. Select
Online
>
Reset
and subsequently
Online
>
Start
in the
menu bar of WAGO I/O-
PRO
to set the values.
Stop application before generating large boot projects!
Stop the WAGO-I/O-
PRO
application via
Online
>
Stop
before generating a very
large boot project, since this may otherwise cause stopping the internal bus. You
can restart the application after creating the boot project.
Handling persistent data affects the program start!
Depending on the variable type, the number and sizes of the persistent data and
their combination, such as in function modules, handling with persistent data can
delay the program start by an extended initialization phase.
Additional Information
The following description is used for fast access. For details on installing missing
communication drivers and using the software, refer to “WAGO-I/O-
PRO
”
available in the Internet under