-16-
(3) Connecting multiple units
Example for connecting multiple servo units
As the remote I/O stations of CC-Link, drivers share the link system and can be controlled/monitored
using programmable driver user programs.
DB
DA
DG
DB
S
LD
F
G
DA
DG
DB
S
LD
F
G
FG
SLD
DG
DA
(Note 2) CC-Link Ver.1.10-compliant cable
MR-J3- T option unit
CC-Link connector (CN1)
(Note 1)
Termination register
MR-J3- T option unit
CC-Link connector (CN1)
Termination register
Programmable controller
CC-Link master unit
(4) Insert the power line
Insert the core of the cable into the opening and tighten it with a flat-blade screwdriver so that it will not
come loose. (Tightening torque: 0.5 to 0.6N m) When inserting the wire into the opening, make sure that
the terminal screw is fully loose.
Loosen
Tighten
CC-Link connector (CN1)
To the next
station
Flat blade screwdriver
Tip thickness 0.4 to 0.6mm
Full wide 2.5 to 3.5mm
To the preceding station or
programmable controller
LECSC□-□
LECSC□-□