-8-
1. Configuration
Minimum equipment and wiring requirements to get started
(*1)
Refer to “LECSC Operation Manual”, Chapter 4 for further details if the power supply voltage is
100VAC.
(*2) When wiring to EMG (Forced stop) of input/output signal(CN6-1), I/O connector(LE-CSNA) or I/O
cable(LEC-CSNA-1) is required.
(EMG (Forced stop) cannot be controlled with CC-Link.)
1
Driver
LECSC*-S*
2
Motor cable
LE-CSM-***
3
Encoder cable
LE-CSE-***
4
I/O connector
LE-CSNA
I/O cable
LEC-CSNA-1
5
CC-Link connector
CN1 (Accessory)
of Mitsubishi Electric System & Service Co., Ltd.
Product number : K05A 502 306 00
6
USB cable
LEC-MR-J3USB
7
Setup software
(
MR Configurator2
TM
)
LEC-MRC2E
8
Main circuit power
supply connector
CNP1 (Accessory)
9
Control circuit power
supply connector
CNP2 (Accessory)
10
Motor connector
CNP3 (Accessory)
11
Battery
LEC-MR-J3BAT
(
a bundled item
)
It is unnecessary when using it with the incremental
system.
Note) The lock cable option is not shown on this drawing. Refer to the
“LECSC Operation Manual” for
details.
Ex)
200 V AC
(*1)
3
2
Electric Actuators
Ex) LEF
L1
L2
L3
N
P1
P2
P
C
D
L11
L21
U
V
W
4
(*2)
PC
6
7
8
9
10
11
5
Provided
by customer
Provided
by customer
1
Provided
by customer
PLC (CC-Link master unit)