
6-15
1020NFM-1D
Section 6
PIPE CONFIGURATION OPTION LIST DEFINITIONS
Fully Developed
Fully Developed flow, as would be expected for very long straight pipe runs or
installation downstream of a flow condition.
1 Elbow
Single 90 degree Elbow upstream of transducer installation.
Dbl Elbow +
Double out-of-plane Elbows upstream of transducer installation.
Dble Elbow -
Double in-plane Elbows upstream of transducer installation.
Valve
To Be Determined.
Expander
Pipe expansion upstream of transducer installation.
Reducer
Pipe reduction upstream of transducer installation.
Norm Entry
To Be Determined.
Header Inlet
Header or pipe manifold upstream of transducer installation.
Intrusions
To Be Determined.
Application Data
Pipe Configuration
Fully Developed*
(Change to Upstream
1 Elbow
Piping)
Dbl Elbow +
Dbl Elbow -
Valve
Expander
Reducer
Norm Entry
Header Inlet
Intrusions
Anomaly Diams
xxxx (numeric entry)
Ö Ú
Ö
Pipe Configuration Menu Structure
* Default
Ú
Ú
Ö
Summary of Contents for SITRANS FUS1020
Page 3: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ...21614 C ...
Page 222: ...21614 C ...
Page 223: ...990TNHM 8 OUTLINE DIMENSIONS TRANSDUCERS TRACKS DEDICATED HYBRID MODE 21614 C ...
Page 224: ...1011FTP 8 21614 C ...
Page 225: ...1011FTNF 8 21614 C ...
Page 226: ...21614 C PFA DFT FLOWTUBE INSTALLATION OUTLINE 992DFTP T 8 ...
Page 227: ...INSTALLATION OUTLINE 992 SERIES EXTENDED FLOWTUBE 21614 C 992DFTN 8 ...
Page 228: ......