
Instruction Manual
IM-106-880, Rev 2.1
April 2017
OCX 8800
9-27
HTR 02
Install Sample Block Heater Rods
1. Before installing sample block heater rods (13, Figure 9-22), evenly coat
the heater rods with Watlube heater release agent.
2. Install the heater rods (13), heater clamps (12), and screws (11).
3. Reconnect the heater rod leads at the sensor housing terminal blocks,
(Figure 9-23).
Figure 9-23. O
2
Cell,
Thermocouple, and
Heater Connections
O
2
Cell Wires
O
2
Heater Wires
Thermocouple Wires
+
+
+
-
O2
ORG
RED
GRN
YEL
T/C O2
+
+
+
-
T/C CO
+
O
2
Cell and Heater Strut
Assembly
-
T/C SB
+
- EXC
-
CJC
+
Sample
Block
Thermo-
couple
Sample Block
Heater Rods
2
HTR 02
1
-
2
HTR CO
1
CO REF
+
-
2
HTR SB
1
CO ACT
+
+ EXC
S
e
nsor
H
o
us
in
g
T
e
rm
in
a
ls
R
e
tur
n
W
ire
3
7
3
9
0
0
6
8
Summary of Contents for OCX 8800
Page 2: ......
Page 4: ......
Page 10: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 ii ...
Page 72: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 4 8 ...
Page 88: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 5 16 ...
Page 100: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 6 12 ...
Page 164: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 7 64 ...
Page 176: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 8 12 ...
Page 213: ......
Page 223: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 10 11 ...
Page 225: ......
Page 262: ...Instruction Manual IM 106 880 Rev 2 1 April 2017 OCX 8800 C 2 ...