The battery pack must be charged before it is used the first time. A new battery pack or
a battery pack which has not been used for a longer time attains full capacity after sev-
eral charge/ discharge cycles.
Charge the battery pack at a constant ambient temperature b0
°C and
+40
°C. If the battery temperature rises above +53
°C, charging is interrupted until the
temperature drops below +45
°C. Large temperature variations can also cause the
charger to be switched off too early.
Use only the original battery pack R&S
EVSG-B3 (1329.8821.02).
If the instrument is connected to the provided AC/DC power supply or to an external
DC power supply with more than 12
V
DC, the internal battery is automatically charged
regardless whether the instrument is switched on or off.
2.2.4
Connecting Devices for Signal Input and Output
1. Connect the RF input connector ("RX 1 IN"/"RX 2 IN") with the receiving antenna
(see
2. Optionally, connect the power supply for an active receiving antenna (see
3. Optionally, connect the GPS receiver (see
4. Optionally, connect a headset (see
2.2.5
Switching the R&S
EVSG1000 On and Off
To switch the instrument on or off, press the [Power] key (see
When the instrument is switched on, the power LED lights up.
If the instrument is operated by the provided DC power supply or by an external DC
power supply with more than 12
V
DC, the internal battery is charged regardless
whether the instrument is switched on or off.
Starting Process
The boot process of the R&S
EVSG1000 takes about 30
seconds. Then the instru-
ment automatically starts the measurement mode used before the instrument was
switched off.
If valid data for automatic calibration is not available, the message "UNCAL" is dis-
played in the status line.