Chapter 9 Ending operation
205
Folding the crane into transport position
All safety notes of chapter 2 shall be observed.
Prerequisites for folding the crane
x
Extension booms are retracted, pinned and secured.
x
No bystanders or obstacles are in the movement range of the crane.
x
Ancillary equipment is secured or removed and securely stored, refer to chapter 6.
x
Main boom is in near vertical position.
The operator must have full view of all crane movements.
Fold the crane in transport position always from the ground operator station opposite the boom
support.
Remote control
Danger!
When the operator is in the folding/unfolding area of the crane there is
an acute risk of fatal injury.
x
Choose a position outside the danger zone of the crane.
Note!
For RTC rope tension control refer to chapter ‘Ancillary equipment,
Ancillary equipment, RTC rope tension control’
Note!
What has to be observed before folding the crane in parking position:
Main boom in near-vertical position, extension booms fully retracted.
Danger!
There is acute danger to life for operators and others, and device and
auxiliary components may get damaged if the steps are not carried out
in the given order.
Always carry out the steps in the correct order.
Summary of Contents for PK 34002-SH P7
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 66: ...Device and function 60 Overview of labels...
Page 76: ......
Page 78: ......
Page 128: ......
Page 158: ......
Page 182: ......
Page 184: ......
Page 208: ......
Page 210: ......
Page 222: ......
Page 224: ......
Page 242: ......
Page 252: ......
Page 254: ......
Page 258: ......
Page 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Page 260: ...254...