Ancillary equipment
130
1 Move the load arm into working position (see ‘Move the load arm to a working position’ in chapter
‘Preparing for crane operation’):
A
x
Move the outer boom in vertical position.
x
Push the extension booms out to distance A (until approx.
50 cm (2 ft) before the pulley head).
2 Assembling the pulley head:
Note!
For the pulley head load capacity refer to ‘Technical data’.
A
B
C
x
Fasten and lock the connecting block (A) in the extension
boom using pins.
x
Actuate ‘Extend extension boom’ until the connecting
block can be attached to the pulley head (B).
x
Fasten and lock the pulley head and connecting block
with pin (B).
x
Rotate the pulley head upwards, until it is possible to
fasten and lock it in the load lug (C).
Summary of Contents for PK 34002-SH P7
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 66: ...Device and function 60 Overview of labels...
Page 76: ......
Page 78: ......
Page 128: ......
Page 158: ......
Page 182: ......
Page 184: ......
Page 208: ......
Page 210: ......
Page 222: ......
Page 224: ......
Page 242: ......
Page 252: ......
Page 254: ......
Page 258: ......
Page 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Page 260: ...254...