Chapter 7 Preparing for crane operation
157
Cable operation
Note!
Cable operation is used as an emergency back-up mode if the
wireless link fails.
Cable mode is also provided for use in areas where emitting wireless
signals is not allowed (e.g. hospitals, nuclear power plants, etc.)
Setting up cable operation
Cable operation is established by attaching the connection cable supplied between the remote control
console and the receiver.
1.
Switch off the remote control console.
2.
Remove plug connectors' protective caps and connect cable as shown.
3.
Restart console (as for wireless mode).
Note!
In cable operation the system does not emit any radio signals.
Cable operation is also possible with no battery fitted.
A 15m long cable is supplied with each system.
Re-establish wireless operation
Cable operation is ended by disconnecting the cable.
1.
Switch off the remote control console.
2.
Disconnect cable, screw protective caps back on.
3.
Insert battery.
4.
Start wireless operation.
Summary of Contents for PK 34002-SH P7
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 66: ...Device and function 60 Overview of labels...
Page 76: ......
Page 78: ......
Page 128: ......
Page 158: ......
Page 182: ......
Page 184: ......
Page 208: ......
Page 210: ......
Page 222: ......
Page 224: ......
Page 242: ......
Page 252: ......
Page 254: ......
Page 258: ......
Page 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Page 260: ...254...