Chapter 7 Preparing for crane operation
163
Stabilizing in general
The stabilizer outriggers and stabilizer cylinders must be extended or retracted separately on both
sides. To do so, alternately use both operating stations.
Fully extend / retract the stabilizer outriggers (mark must be visible).
If your crane is equipped with a stability control system refer ‘HPSC stability control’, chapter 5.
Move tiltable stabilizer cylinders into their position only after extending the outrigger beam.
The safety distance must be observed.
Danger!
Serious risk of getting crushed near the tiltable stabilizer! If the
operator or others are in the slew range of the stabilizer cylinder there
is acute danger of life for them.
Neither the operator nor bystanders are allowed to step in the
slew range of the stabilizer cylinder.
Summary of Contents for PK 34002-SH P7
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 66: ...Device and function 60 Overview of labels...
Page 76: ......
Page 78: ......
Page 128: ......
Page 158: ......
Page 182: ......
Page 184: ......
Page 208: ......
Page 210: ......
Page 222: ......
Page 224: ......
Page 242: ......
Page 252: ......
Page 254: ......
Page 258: ......
Page 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Page 260: ...254...