Preparing for crane operation
158
Working range
Danger!
There is acute danger to life for operators and others in the entire
working range of the crane (slewing range and under suspended
loads). Allowing bystanders in the working range is grossly negligent.
x
The operator must have full view of the crane movements and the loading/unloading point. If this is
impossible the operator must be aided by a qualified signaller.
x
Plan in sufficient clearance for crane operation and support. Crane movements may not be
obstructed by lines, masts, trees, buildings or other objects.
x
The entire working range of the crane is a danger zone.
x
No other work may be carried out within the working range.
x
Streets, path ways, bicycle lanes or sidewalks etc. that cross the working area must be blocked
during the entire crane operation.
x
The entire working range must be lit during twilight or darkness so that the work can be carried out
safely.
Danger!
In case of insufficient visibility stop work immediately.
Summary of Contents for PK 34002-SH P7
Page 1: ......
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 26: ......
Page 30: ......
Page 66: ...Device and function 60 Overview of labels...
Page 76: ......
Page 78: ......
Page 128: ......
Page 158: ......
Page 182: ......
Page 184: ......
Page 208: ......
Page 210: ......
Page 222: ......
Page 224: ......
Page 242: ......
Page 252: ......
Page 254: ......
Page 258: ......
Page 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Page 260: ...254...