4.3 Ramp Rise Rate Setup Program
E5EK
4--11
Ramp rise rate setup programs take the PV at start of program opera-
tion as the SP (PV start) when they are started.
When the rate of rise is changed midway during operation, the SP rate
of rise and the step time in the ramp cycle both change.
After change
Before
change
Switching point
Time
Before change
After change
Step N
Step N+1
Step N
Step N+1
•
In the above figure, increasing the rate of rise results in a shorter tar-
get step time. Likewise, when the SP is changed, the step time of the
ramp cycle also changes.
•
When the soak time is changed, only the step time in the soak cycle
changes.
J
Running the ramp
rise rate setup
program
F
Changing
parameters
Summary of Contents for E5EK
Page 1: ...User s Manual Cat No H089 E1 02 Digital Controller Programmable Type...
Page 24: ...CHAPTER 1 INTRODUCTION 1 14...
Page 36: ...CHAPTER 2 PREPARATIONS 2 12...
Page 162: ...CHAPTER 6 USING THE COMMUNICATIONS FUNCTION 6 20...
Page 176: ...CHAPTER 7 CALIBRATION 7 14...
Page 193: ...SETTING LIST A 11...