CHAPTER 12: MAINTENANCE
LMV1000 (G)(E) AIR-COOLED LASER MARKER
12-8
990-541
13.
Remove the protective cap from the optical fiber and slowly insert it horizontally into the new
LD module.
14.
Secure the optical fiber onto the LD module by turning the fastening nut CW (clockwise).
Tighten snugly,
but do not overtighten
.
15.
Insert the LD – I/O connector so that
the
RED
marks align.
16.
Connect the LD Power Supply, Peltier Power Supply, thermal switch and relay connectors.
CAUTION
Before
replacing the top cover back onto the Control Unit, verify that the short-circuit
jumper is placed between the two
red
terminals. If the jumper is connected between the
red
and
black
terminals, this will produce a short-circuit that may damage the Marker.
17.
Insert the short-circuit jumper between
the two
RED
terminals as shown
Summary of Contents for LMV1000
Page 8: ...LMV1000 G E AIR COOLED LASER MARKER viii 990 541...
Page 9: ...LMV1000 G E AIR COOLED LASER MARKER 990 541 ix...
Page 17: ......
Page 35: ......
Page 47: ......
Page 215: ...8 COMMUNICATION FUNCTION OPTION LMV1000 G E AIR COOLED LASER MARKER 8 14 990 541...
Page 231: ......
Page 237: ......
Page 239: ...11 OUTLINE DIMENSIONS LMV1000 G E AIR COOLED LASER MARKER 11 2 990 541 Oscillator Continued...
Page 241: ...11 OUTLINE DIMENSIONS LMV1000 G E AIR COOLED LASER MARKER 11 4 990 541 Oscillator 1 2 3 4...
Page 243: ......
Page 259: ......