6-1
6
Checks
6.1
Equipment condition Inspection
6.1.1 Inspection Schedule
The inspection schedule for the first year after installation is shown below.
Model
Inspection Schedule
Remarks
6 months after installation
12 months after installation
DC-6/DC-6T
--
1
6.1.2 Checks before inspection
6.1.2.1
Check the system conditions
Check the items below together with the user, thus confirming the system conditions. Check:
1)
Any abnormality while the system is in operation;
2) Occasional abnormalities;
3) Other items requested by the user.
6.1.2.2
Check the operating environment
Check the temperature and humidity in the examination room. The measurements related to
electric safety are particularly sensitive to the humidity. These measurements are also
sensitive to the measuring location and measuring circuit.
If the insulation characteristics deteriorate due to the system changes over time or system
malfunctions, the measurement fluctuations are likely to increase with the increase in
humidity.
6.1.2.3
Check the system settings
Check the preset conditions of the system, brightness and contrast of the monitor, and
optional devices (including the transducer).
6.1.2.4
Check the system version
Press the F10 key on the keyboard to enter the preset menu, select the system preset item to
enter the system preset screen, and click the system information button to check the software
Summary of Contents for DC-6
Page 1: ...DC 6 DC 6T DC 6Vet Diagnostic Ultrasound System Service Manual...
Page 2: ......
Page 20: ...2 1 2 System Overview 2 1 System Appearance 2 1 1 Complete System with CRT Monitor...
Page 23: ...System Overview 2 4 2 2 LCD Monitor...
Page 26: ...System Overview 2 7 2 2 3 Lever of upper support arm...
Page 66: ...4 1 4 System Structure and Assembly Disassembly 4 1 Exploded View of Complete System...
Page 101: ...System Structure and Assembly Disassembly 4 36 Power boards Card detacher...
Page 191: ...P N 2105 20 40473 V10 0...