Pressing the TEST ASSET button starts the testing process.
Testing safety message screens appear next, followed by the screen for the selected test.
Fig 106:
Automatic test initiation screen.
Automatic RLC Test
1. When the Auto RLC test starts to run, select the lead(s) that you want to test or select ALL LEADS. Monitor the RLC
screen to view test results collected when the test completes.
2. If capacitance testing is turned on in the test configuration, the software will alert you to reconfigure the test leads
as shown in the example below. Test Lead 1 will be connected to motor lead 1, test lead 2 to the motor frame, and
test lead three will be disconnected (not contacting any motor lead or ground).
NOTE: Acknowledge this message only after the leads have been reconfigured. Pressing the OK button
will immediately initiate the capacitance test.
Fig 107:
Auto RLC test: change lead message for capacitance testing.
3. Another message will appear after the capacitance test completes, telling you to restore the test leads to their
original connections.
Ensure that the connections are restored before clicking OK
.
4. When testing completes, press SAVE to record your data on the local database.
5. Press the EXIT icon in the top right corner to leave the RLC Test screen.
www.megger.com
Megger Baker ADX User Guide
109
Auto Tests
Summary of Contents for ADX15
Page 1: ...Megger Baker ADX Automated Diagnostic Test Equipment User Guide...
Page 2: ...www megger com Megger Baker ADX User Guide...
Page 10: ...www megger com Megger Baker ADX User Guide viii Table of Contents...
Page 44: ...www megger com Megger Baker ADX User Guide 34...
Page 84: ...www megger com Megger Baker ADX User Guide 74 Routes...
Page 148: ...www megger com Megger Baker ADX User Guide 138...
Page 172: ...www megger com Megger Baker ADX User Guide 162...